Situated in the heart of Ashburton this two storey rebuild and extension has created an eye-catching, light filled work environment for the tenants that stands out from its more traditional style neighbours. Well known Ashburton builders Bradford Construction took on the challenge of removing and rebuilding half of the existing building and creating a new extension including a new entry, foyer & lift.

Seamless panels of glass appear to float in front of exposed structural steel in the light filled entrance and stairwell. The full height seismic flush glazing creates a welcoming facade to clients.

It was a requirement that the accountancy firm Brophy Knight were to remain fully operational while the work took place. Careful management was required to ensure disruption was kept to a minimum while also ensuring all health & safety requirements were met.

THE WINDOWS & DOORS

  • Altherm Commercial 100mm Flushglaze
  • Altherm Commercial 100mm Shopfront
  • Altherm 106mm Architectural
  • Altherm Metro Series
Like what you see?
Contact us to request a quote

Return to gallery